CGH Nova União II is a small hydro plant being built in Nova União, Minas Gerais, Brazil, by GVS Group's engineering and construction team. It will have 0.5 MW of capacity and will be connected to the Cemig grid.
Source
Installed capacity
Solar equivalent
1.31 MWp
Location
Utility
Cemig
In operation since
Expected start of operation
2027
Desenvolvemos, Construímos