| Nova União,

CGH Nova União II

CGH Nova União II is a small hydro plant being built in Nova União, Minas Gerais, Brazil, by GVS Group's engineering and construction team. It will have 0.5 MW of capacity and will be connected to the Cemig grid.

Source

Installed capacity

1.31 MWp / 0.5 MWac 0.5 MW

Solar equivalent

1.31 MWp

Location

Nova União,

Utility

Cemig

In operation since

Expected start of operation

2027

What we did at this plant.

Desenvolvemos, Construímos

Where it is.

Nova União,