CGH Alto Glória generates hydro power in Fervedouro, Minas Gerais, Brazil, with 3 MW of capacity, and is connected to the Cemig grid. It is part of the portfolio operated by GVS Group.
Source
Installed capacity
Solar equivalent
12.12 MWp
Location
Utility
Cemig
In operation since
Expected start of operation
2025
Adquirimos, Operamos