| Raul Soares,

CGH Raul Soares II

CGH Raul Soares II generates hydro power in Raul Soares, Minas Gerais, Brazil, with 0.5 MW of capacity, and is connected to the Cemig grid. It is part of the portfolio operated by GVS Group.

Source

Installed capacity

2.53 MWp / 0.5 MWac 0.5 MW

Solar equivalent

2.53 MWp

Location

Raul Soares,

Utility

Cemig

In operation since

Expected start of operation

2025

What we did at this plant.

Desenvolvemos, Construímos, Operamos

Where it is.

Raul Soares,
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.