| Ubaporanga,

CGH Chica Valadares

CGH Chica Valadares generates hydro power in Ubaporanga, Minas Gerais, Brazil, with 2 MW of capacity, and is connected to the Cemig grid. It is part of the portfolio operated by GVS Group.

Source

Installed capacity

7.41 MWp / 2 MWac 2 MW

Solar equivalent

7.41 MWp

Location

Ubaporanga,

Utility

Cemig

In operation since

Expected start of operation

2023

What we did at this plant.

Desenvolvemos, Construímos, Operamos

Where it is.

Ubaporanga,
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.